CSM 1.x File Naming Conventions
The B-Series (active atm, ice, lnd, & ocn)
- b040 (Jun 99)
This fully coupled run examines VP ice dynamics, lnd runoff, etc..
Resolution is T42 for atm & lnd and NCOM 2x2' for ocn & ice.
Improvements include: higher ocn resolution near equator, ocn BBL,
use of runoff in lnd & ocn, VP ice dynamics.
- IPCC 21st century A1,A2 and B2 simulations (Winter 99)
Resolution is T42 for atm & lnd and NCOM 2x2 for ocn & ice.
b030.02, b030.03, b030.04
The CSM IPCC A1 Scenario in three segments:
1980-2000
(b030.02) 2000-2080 (b030.03) 2080-2100 (b030.04).
6 hourly output
from the atmosphere was kept for the first and third segments
b030.05, b030.06
The CSM IPCC A2 Scenario in two segments:
1980-2000
(b030.05) 2000-2100 (b030.06).
b030.05, b030.10
The CSM IPCC B2 Scenario in two segments:
1980-2000
(b030.05) 2000-2100 (b030.10).
- s020
A 21st century simulation run (Dec 98)
Business-as-Usual (BAU) and CO2 Emissions Controlled scenarios
Resolution is T42 for atm & lnd and NCOM 2x2 for ocn & ice.
- 20th Century (1870-1990) historical simulations (Sep 98)
These runs examine various combinations of time-varying sulfate,
greenhouse gases and solar input at T42 atm/lnd and 2x2 ocn/ice
resolution.
b019.17
1870-1990 with time-dependent: Greenhouse Gases
b018.15
1870-1998 with time-dependent: atmospheric sulfur, Greenhouse Gases
b019.12
1870-1990 with time-dependent atmospheric sulfur, Greenhouse Gases,
Solar Variability
- Constant 1870's, pre-industrial, control runs (Jun-Nov 98)
Resolution is T42 for atm & lnd and NCOM 2x2 for ocn & ice.
b018.12
40 year fully-coupled simulation used as initial condition for
b018.15 20th century runs.
b018.16
10 year constant 1870 simulation
b018.16l
220 year constant 1870 simulation (continuation of b018.16)
- b006
A CO2 warming experiment (Mar 97)
This is a 130 year simulation with CO2 levels increasing 1% per year.
Compare to case b003, a constant CO2 basis case.
Resolution is T42 for atm & lnd and NCOM 2x2 for ocn & ice.
- b004
A low resolution CSM control integration (May 97)
A lower-resolution fully coupled control run. g008 + b004 combine
to form the control run presented at the June 97 CSM Workshop.
Resolution is T31 for atm & lnd and NCOM 3x3 for ocn & ice.
- b003
A primary CSM1.0 control integration (Aug 96 thru Feb 97)
This is an improved fully coupled control run (a 300 year simulation).
g006 + b003 combine form the improved fully coupled control run
(a 300 year simulation) presented at the June 97 CSM Workshop.
Resolution is T42 for atm & lnd, NCOM 2x2 for ocn and ice.
- b001
The first CSM1.0 control run (May 96)
The first fully coupled CSM control run.
g005 + b001 combine form the first CSM fully coupled control run.
These runs were presented at the May 96 CSM Workshop.
Resolution is T42 for atm & lnd and NCOM 2x2 for ocn & ice.
The G-Series (active ice & ocn, inactive atm & lnd)
- g040 (June 99)
This is an improved ice+ocn spinup run.
Resolution is T42 for atm & lnd and NCOM 2x2' for ocn & ice.
Improvements include: higher ocn resolution near equator, ocn BBL,
use of runoff in lnd & ocn, VP ice dynamics.
- g008 (May 97)
A lower-resolution ice+ocn spinup run.
g008 + b004 combine to form the control run
presented at the June 97 CSM Workshop.
Resolution is T31 for atm & lnd and NCOM 3x3 for ocn & ice.
- g007 (Sep 97)
An ice+ocn spinup run specifically intended for experiment b007,
a "pre-industrial" control simulation.
Resolution is T42 for atm & lnd and NCOM 2x2 for ocn & ice.
- g006 (Jul 96)
This is an improved ice+ocn spinup run (replaces g005).
g006 + b003 combine form the improved fully coupled control run
(a 300 year simulation) presented at the June 97 CSM Workshop.
Resolution is T42 for atm & lnd and NCOM 2x2 for ocn & ice.
- g005 (Apr 96)
The first CSM ice+ocn spinup run (with "climatological data models"
standing in for atm & lnd components).
g005 + b001 combine form the first CSM fully coupled control run.
These runs were presented at the May 96 CSM Workshop.
Resolution is T42 for atm & lnd and NCOM 2x2 for ocn & ice.