CVCWG Simulations | Completed & Published

The following table summarizes the simulations completed by the CVCWG that have been published on the Climate Data Gateway (CDG, formerly ESG) portal here at NCAR or the core Earth System Grid Federation (ESGF) CMIP5 portal at PCMDI.

These simulations were published within the time period of January 2014 - June 2018. The table will be updated periodically as new runs are completed and published.

Datasets/Simulations

Model Case Name(s) Description Additional Info Month Published
CCSM4 CCSM4/CAM4 FV1 slab ocean model 1% per year CO2 increase simulation, years 51-500 CCSM4/CAM4 FV1 slab ocean model 1% per year CO2 increase simulation, years 51-500 10/2015
CCSM4 f.e11.F2000C5.f09_f09.control.001 f.e11.F2000C5.f09_f09.control.001 data 02/2015
CCSM4 20th century ensemble 30x36 year (1970-2005) Fully-coupled, all components, all time sampling 06/2014
CESM Accelerated Scientific Discovery CESM simulations from the Accelerated Scientific Discovery phase of Yellowstone 02/2015
CESM-WACCM b40.rcp8_5.2deg.wcm.00[4-5] RCP8.5 WACCM, all components, all time sampling
CESM-WACCM Climatology of global aerosol properties Climatology of global aerosol properties calculated based on new volcanic emissions database combined with other non-volcanic emissions of sulfur sources. For more information, contact Mike Mills, NCAR ACOM, mmills@ucar.edu. DOI 10.5065/D6S180JM 01/2016
CESM-WACCM b40.rcp2_6.2deg.wcm.00[2-4] RCP2.6 WACCM, all components, all time sampling 02/2014
CESM1 CESM1 Last Millennium Ensemble Project CESM1 Last Millennium Ensemble Project See Last Millennium Ensemble Project web page. 02/2015
CESM1-CAM5 b.e10.B20ANTHROC5CN.f09_g16.00(1,2,4) 20C (1850-2005) anthropogenic-only forcings all components 07/2014
CESM1-CAM5-BGC Large ensemble Large Ensemble (Click through for member information) Updated 2/2016; LENS Website 06/2014
CESM1-CAM5-BGC Medium ensemble 15xRCP8.5 (2006-2080), branching from corresponding large ensemble runs on January 1st 2006. Updated with 5 additional ensemble members in 12/2014 08/2014
CESM1-CAM5 b.e10.B20TRC5CN.f09_g16.[003,005] 20C (1850-2005) Transient   10/2016
CESM1-CAM5 b.e11.B1850C5CN.f19_g16.008 2° Pre-Industrial Control   10/2016
CESM1-CAM5-BGC Low Warming runs Low Warming runs (Click through for member information) Project information 01/2017
CESM1-CAM5-BGC Pacific Pacemaker Pacific Pacemaker runs (Click through for member information) Project information 01/2017
CESM-WACCM Ivy et al WACCM simulations Fully-coupled WACCM simulations with two different aerosol forcing files 01/2017
CESM-CAM4 Single Forcing runs Single forcing runs 05/2017
CESM-GOGA CESM GOGA simulations CESM GOGA simulations 06/2017
CESM2 (WACCM-X) f.e20.FXSD.f19_f19.001 f.e20.FXSD.f19_f19.001 06/2017
CESM1.1-CAM5 CESM Radiative Kernels simulations Radiative kernels and forcing calculated with CESM1.1 (CAM5) 06/2017
CESM-WACCM SO2 injection matrix simulations data SO2 injection matrix simulations performed to identify the aerosol optical depth and climate response of stratospheric SO2 injections for different locations and amount. 06/2017
CESM-WACCM SO2 injection control and feedback simulations Simulations of stratospheric sulfate aerosol geoengineering using multiple injection locations to meet multiple simultaneous surface temperature objectives 07/2017
CESM1-CAM5 CESM1 Fixed Ozone Ensemble Instead of prescribing a time-varying ozone concentration as in LENS, ozone is kept at constant 1955 concentrations. 09/2017
CESM CAM4-chem Geoengineering CCMI experiment Three sets of experiments as part of the Chemistry Climate Model Initiative project. 09/2017
CESM1-BGC b40.20th-rcp8.5.1deg.bdrd.002 An ensemble member of CESM1(BGC) using the RCP8.5 forcing scenario to 2300, using prescribed CO2 concentrations. 12/2017
CESM1-WACCM Geoengineering Large Ensemble (Control) The Stratospheric Aerosol Geoengineering Large Ensemble project 20-member ensemble of control simulations over a reference period between 2010-2030. 01/2018
CESM1-WACCM Geoengineering Large Ensemble (Feedback) The Stratospheric Aerosol Geoengineering Large Ensemble project 20-member ensemble of stratospheric sulfate aerosol geoengineering simulations between 2020-2099. 01/2018
CESM1-CAM5 CESM1 CAM5 Decadal Prediction Large Ensemble A set of simulations carried out at NCAR to support research into near-term Earth System prediction. 01/2018